Case Study:
Holiday Inn, Stevenage

 

Background

The Holiday Inn in Stevenage took decisive steps toward energy efficiency and sustainability by partnering with Powerhub Solutions. We delivered a full-spectrum solution that included:

• A Commercial Solar PV
• Voltage Optimisation (VO)
• KBR Energy Saving Solution

This multi-technology rollout has significantly reduced the hotel’s carbon footprint and energy spend with combined annual savings of over £27,500 and over 27 tonnes of CO2 saved.

Commercial Solar Panel Installation:

In May 2025, Powerhub Solutions installed a custom rooftop solar PV system at Holiday Inn Stevenage. The design was tailored to fit the hotel’s energy needs and roof layout. This project marked a key step in the hotel’s shift to more sustainable energy.

The Installation included:

• 127 x 500W DMEGC solar panels
• 63.5kW total system capacity

This high-performance array generates an estimated 48,900 kWh annually, powering the hotel’s daily operations with clean, renewable energy and reducing exposure to fluctuating electricity prices.

•Payback period: 3 years and 5 months

•kWh₂ savings per year: 48,900 kWh

• CO2₂ savings per year: 12.4 tonnes

Voltage Optimisation Installation:

Installed in January 2025, our Voltage Optimisation unit enhances power quality and reduces voltage-related energy waste without disrupting hotel operations.

Forecasted Year 1 Impact:

  • Energy Savings: 51,328 kWh

  • Carbon Savings: 10,627.4 kg CO2

KBR Energy Saver Installation

Installed in December 2024, the KBR Energy Saver was installed at the Holiday Inn Stevenage to reduce energy waste across multiple operational areas, including their kitchen, bar, and restaurant. These intelligent energy-saving solutions optimise a range of electrical equipment, from bottle fridges to beer cellars, helping to lower consumption without impacting performance.

Forecasted Year 1 Impact:
• Energy Savings: 51,328 kWh
• Carbon Savings: 10,627.4 kg CO2

By implementing the KBR Energy Saver, Holiday Inn made a strategic investment in long-term efficiency and environmental responsibility.

Combined Saving Results

Annual Energy Savings (kWh) Annual CO2 Savings (kg)
Solar PV Systems 48,900 12,400
Voltage Optimisation 51,328 10,627.40
KBR Energy Saver 23,152 4,793.70
TOTAL 123,380 kWh 27,821.1 KG

Powerhub delivered a fully integrated energy solution combining solar panels, Voltage Optimisation our KBR Energy Saver.
Together, these technologies now work in harmony to slash electricity bills by over £27,500 annually, while saving more than 27 tonnes of carbon emissions each year! This project is a powerful example of how layered, strategic energy solutions can future-proof a site, drive major cost savings, and deliver real sustainability impact.