Hotel
- Client
- Hotel group, Stevenage
- Sector
- Hotels
- Solution
- Solar PV and BESS

The short version.
The 30m high roof and limited parking made lifting kit onto the roof difficult. The client wanted lower costs and CO₂ across the group.
A 64kW flat roof PV system went in with a Solis inverter. The install took 1 week on site.
The system saves an estimated £13,400 a year with 100% self consumption. ROI is 3 years and 3 months.
Project Overview
Client: Hotel Group Location: Stevenage Industry: Hospitality System Size: 64kWp Carbon Savings: 13.2 Tonnes of CO2 per Year Annual Energy Generation: 52,279kWh

Background
We are working with a hotel management company who are long-term clients. Part of their remit for their sites is offset a proportion of CO2 per year and reduce costs to meet their sustainability targets. Although the building was small compared to the usage, we still managed to save them a combined 15% across various solutions including solar PV.
- Challenges: The main challenge of this install was the height of the building and limited amount of car parking available to get plant into the site to do lifting of the kit on the roof.
- Objectives: Reducing energy costs and CO2 emissions throughout the group.
Solution Provided
- System Design: A flat roof 64kW PV installation on a 30m high rooftop using Van Der Valk mounting system. 1x 50kW Solis Inverter was installed across 1 connection points.
- Installation Process: Being a flat roof, we confirmed the structural suitability & condition of the roof. There was existing rail and parapet wall on the roof which complied with H&S requirements during the installation. In the background we applied to the DNO for grid approval and planning consent to then progress with the installation. The install was then 1 weeks on site and although the high roof posed its challenges the install went smoothly.
- Technology Used: The site is installed with a specialist flat roof mounting system and Solis inverters which provide the client with monitoring of the system.
Results & Benefits
- Cost Savings: Estimated energy cost reduction per year £13,400.
- Carbon Footprint Reduction: Reduction in CO2 emissions 13.2 tonnes/year.
- Energy Independence: 7% reduction on reliance from the gird.
- Self-Consumption: 100% Self consumption.
- Return on Investment (ROI): 3 Years & 3 months.

Calculate how much you can save with solar PVs here