Pulse Control

You can't see the waste.We switch it off.

One controller that schedules, controls and meters every asset on site. And we guarantee the bill comes down.

Pulse Control edge controller by powerhub
Pulse ClimateDining AC held at 21°C
Watch a day

Same site. Same trade. Less running.

Press play and watch Pulse switch off what nobody needs.

06:00Closed
00:0006:0012:0018:0024:00
Kit hours without Pulse0.0 h
Kit hours with Pulse Control0.0 h
Running hours cut today0.0 h

Illustrative site open 11:00 to 23:00. Hours are added up across the six assets shown.

Kitchen

Fryers and retherm

Off
Kitchen

Extract fans

Off
Front of house

Dining AC

Off
Cellar

Cellar cooler

Off
Outside

Signage and lights

Off
Back of house

Hot water

Off
RunningSwitched off by PulseIdling overnight
Eight modules, one controller

If it takes power, Pulse can control it.

Our own controller sits by the distribution board and runs with the internet off. Start with one module and add the rest when it pays.

Pulse Climate

Set points and schedules held per zone, so AC stops fighting the extract.

Managed, never cut

Pulse Therm

Heating and hot water ready for open, off when the doors close.

Switched at the supply

Pulse Cold

Cellar and fridge cooling run to what the site is doing. Set point lifts overnight.

Managed, never cut

Pulse Kitchen

Fryers, retherm and holding cabinets on for service, not for open-up.

Switched at the supply

Pulse Vent

Extract runs when the kitchen runs. Not all night.

Switched at the supply

Pulse Light

Signage and lighting to opening hours and daylight.

Switched at the supply

Pulse Drive

Pumps, motors and anything else with a supply. If it takes power, we schedule it.

Switched at the supply

Pulse Meter

Every asset metered to the power factor, so every saving is proven.

Measured, not estimated
The Pulse Control dashboard

Every asset, every site. One screen.

Head office sets the schedules and sees every override. Site managers get a simple override on their phone. Every saving is metered.

Schedules from one screen

Per asset, per site or estate wide.

Overrides logged

Managers can switch on, head office sees who and when.

Instant alarms

Know at 3am, not the next morning.

Every kWh metered

Before and after, per asset.

What changes once Pulse is in

Control goes live in week 4. The evidence pack follows at week 10.

Your cellar works as hard at 3am
as on a Saturday night

Take 20 to 30% off the cellar and refrigeration load.

Pulse learns how each cooler behaves and lifts the set point when nothing is moving. It never cuts the power, and food safety limits are the hard floor.

What it does

  • Learns how each cooler behaves
  • Lifts the set point when nothing moves
  • Food safety limits never crossed
  • Instant alarm on any excursion
Get a savings insight
Bartender pulling a pint
Cellar cooler compressor run time by hour
TodayWith Pulse Control
0%20%40%60%80%00:0006:0012:0018:0024:00

Illustrative profile from surveyed sites. Replaced with your own metered data after the proof of concept.

You see the kWh,
not a percentage on a slide

Every controlled asset metered, before and after.

Your main meter, gas and water sit on the same screen, and the guarantee is measured on the same data. Live now on Taco Bell franchise sites.

What it does

  • Before and after on every asset
  • Main meter, gas and water in one view
  • Evidence pack at week 10, per asset
Get a savings insight
Chef working in a commercial kitchen
Your evidence packWeek 10
  • Per-asset before and after, in kWh and pounds
  • Whole-site view
  • Override log
  • Alarm log
  • Site-by-site ROI for the estate proposal
What every proof of concept site receives.

Under two years.
Quick wins in six months.

One payment, then data only at about £50 to £150 a site a year.

Kitchen scheduling usually pays back first. Your survey sets the figure for each site and we guarantee it.

What it does

  • No monthly service fee
  • No share of your savings
  • Saving guaranteed against your survey
Get a savings insight
Friends raising a toast in a bar

Typical payback by measure

Kitchen equipment scheduling6 to 9 months
Air conditioning control9 to 12 months
Cellar and refrigerationAround 16 months
Whole site, all measuresGuaranteedUnder 24 months
06121824 months

Ranges from surveyed sites. Your survey sets the figure and the guarantee.

Where it works

Proven in hospitality. Ready for every sector.

Hospitality is the hardest test: long hours, busy kitchens and cellars that never stop. The same controller works anywhere kit runs when nobody needs it.

Why Pulse Control

Three ways to buy control. One that you own.

Pulse ControlTypical EMS
Own controller and firmwareYesNo
Cooling learns each assetYesPartly
Full metering on every assetYesPartly
Keeps running when the internet dropsYesPartly
Own SIM, nothing on your Wi-FiYesNo
Fails safe to power onYesPartly
No monthly service feeYesNo
Saving guaranteedYesNo
How we start

Two sites. Ten weeks. Then you decide.

Fixed price, credited against the estate order. You keep the kit whatever you decide.
Week 1

Survey

Weeks 2 to 3

Baseline metered

Week 4

Install and go live

Week 10

Evidence pack

Week 11

Estate proposal

Put a figure on your savings

Pick your sector and annual spend for a first look, then book a demo to see Pulse running on your real data.

A first look at your savings

Fiona from the powerhub team

See it on your own numbers

Book a 30 minute demo and one of our experts will show you Pulse running on your estate.

Request a demo

The savings shown reflect the average energy bill reductions achieved by customers combining our energy reduction technologies. Individual performance will vary. Voltage Optimisation alone typically delivers up to 12% savings, and every technology also lowers your site's carbon footprint alongside its running costs.

Questions

Quick answers

No. We never cut power to refrigeration. We manage the cooling command inside the fridge's own control circuit, so it cools when it needs to and idles when it does not. Food safety temperatures are the hard floor.

It depends on the site, which is why we survey first. Typically 15 to 25% on AC, kitchen equipment overnight down to zero and 20 to 30% of the cellar and refrigeration load. We put a number on your site after the survey and we guarantee it.

No. Work is done around trading, usually a morning at the distribution board and short visits to the AC and refrigeration controllers. No rewiring.

No. It uses its own multi-network mobile SIM. Your IT team never has to hear about it.

The site carries on exactly as configured, because the schedules and logic live on the controller, not in the cloud. When the connection returns, every reading from the gap is sent back.

Yes. Site managers get a local override for a deep clean or a late event. Every override is logged and head office sees it. Head office holds the schedules.

Next step

Which two sites would you bet are the worst?

Name them. We will survey them, meter them and show you what they are really costing.