
Our Process: No kWh Left Unsaved
When it comes to energy reduction, most suppliers sell a product. We deliver a process. From first call to verified savings, everything is designed, managed, and delivered by our own in-house engineering, electrical, and project management teams. That’s how we guarantee results.
- STEP 1
Kickstart: Book a Call
Just 15 minutes is all it takes. We’ll introduce our approach, answer your questions, and give you a first view of where the biggest opportunities sit. (Need more detail? We can go as deep as you want.)
- STEP 3
Forecast: Desktop Proposal
We run the numbers and share a clear, conservative proposal: expected costs vs expected ROI.
No inflated claims, no unrealistic paybacks. We always present worst case figures, and then deliver better.
- STEP 5
Prove: Project Sign Off or Pilot
You choose:
- Go straight to rollout with guaranteed savings, or
- Trial a proof-of-concept pilot across a handful of sites
Either way, the numbers will prove themselves.
- STEP 7
Sustain: Ongoing Monitoring & Support
With CapEnergy monitoring, every site and every asset is tracked continuously. Savings are verified, reports flow to Finance, and any drift is flagged before it costs you money.
Your dedicated Powerhub project manager keeps everything on track, because success doesn’t end with install.
- STEP 2
Diagnose: Data Discovery
Your half hourly data (HHD) tells us the truth about your site’s energy profile. We analyse consumption patterns, peak loads, and anomalies to uncover the hidden savings potential that others miss.
- STEP 4
Guarantee: Proposal from Site Surveys
We run the numbers and share a clear, conservative proposal: expected costs vs expected ROI.
No inflated claims, no unrealistic paybacks. We always present worst case figures, and then deliver better.
- STEP 6
Deliver: Installation & Verification
Our in house teams deliver the full install, VO, KBR, IoT, Solar, safely, quickly, and with minimal disruption. We establish a baseline before install, then show direct kWh reduction via real time dashboards and clear reports. From there, savings are extrapolated estate wide, giving you the business case for full rollout.
Why Our Process Wins
- In house delivery: Engineers, electricians, project managers, all on our payroll. No subcontractors, no excuses
- Transparency: Conservative ROI models, guaranteed savings, live monitoring
- Total coverage: Site level optimisation (VO) + asset level (KBR) + IoT + Solar
- Proven results: 15–20% reductions, ROI inside 24 months, across hundreds of hospitality sites









