Big nights.Smaller energy bills.

Lighting, HVAC, bar fridges and cellar cooling run all day, even though the crowd is only in for a few hours. We cut what they waste and verify every kilowatt against a baseline you sign.

Tell us about your site, or send us your half hourly data. We come back within 24 hours with what we can see, and we talk it through. No charge, no obligation.

Up to 15%less electricity with voltage optimisation
Up to 15%less electricity with voltage optimisation
~30%less cellar cooling with Cellar Manager
5 weeksbetween beer line cleans with LineProof
12 to 18months typical KBR payback
Why it costs more

Doors open for a few hours.Your appliances run for all 24.

Lighting, HVAC, bar fridges, cellar cooling and beer coolers keep drawing power before doors, after close and on every dark day in the diary.

Then the pressure flips. Thousands of pints in a short interval, and every bar has to be cold and ready.

Every kind of venue

From small roomsto 60,000 seat stadiums.

Arenas and stadiums

Floodlights, dozens of bars, long beer line runs and kitchens that sit idle between fixtures.

Music venues and bars

Tight margins, late nights and cellars that keep cooling on every dark day.

Theatres

Stage lighting, HVAC for a full house and interval bars that run flat out for twenty minutes.

Cinemas

Projection, HVAC across every screen and concession fridges that never switch off.

Ice rinks and leisure

Ice plant and refrigeration are the biggest loads of all, so every volt counts.

Festivals and events

Temporary bars and kitchens that need to be cold and ready on the day.

Every bar cold for the interval rush
Where it goes~30%less cellar cooling with Cellar Manager.
From small rooms to festival sites
What it saves5 weeksbetween beer line cleans with LineProof.
The Powerhub guaranteeOn every product we install

If the saving isn’t delivered,we pay the difference.

In writing

The saving is written into your contract before we start.

Measured, not estimated

Every kWh checked against a baseline you sign.

Reported monthly

You see the numbers. If we fall short, we make it up.

Pulse

Every bar and cellaron one screen.

What each venue used, what it saved and when a cellar or fridge starts to drift.

pulse./ Venue overviewLivePH
Event days and dark days, this monthYour verified savings
£9,860cost saved
39,440 kWhenergy saved
7.0 tCO2 avoided
kWh per event4,82012% down vs last event
Dark day load182 kWtarget 120 kW
Cost per attendee21pcarbon per head ready
Where Saturday’s energy wentArena North
Live
Heating and cooling36%£1,310
Lighting and show power24%£874
Catering16%£582
Refrigeration12%£437
Concourse7%£255
Venues, kWh per eventLast 30 days
1Arena North4,820
2Exhibition Hall5,310
3Riverside Theatre2,140
4Conference Centre3,920

Bowl lighting on 4 hours after load out, Arena North

42 bar fridges on, no event until Friday

Kitchen extract running, catering closed, Exhibition Hall

kWh and cost by venue

See every site side by side.

Temperatures logged

Cellar and fridge temperatures for EHOs and brand audits.

Event day vs dark day

See what your venue uses when nobody is in.

FAQ

Questions people ask

01Why is voltage optimisation such a good fit for venues?
Stadiums, arenas and theatres run huge amounts of lighting, HVAC, motors and cooling, and UK mains often arrives at a higher voltage than that equipment needs. Voltage optimisation fits once at the incoming supply and brings the whole venue down to the right level, cutting electricity use by up to 15% with no change for your crowd or your shows. Lights and motors also run cooler, so they last longer.
02How much energy can a venue save?
It depends on your supply voltage, how often you trade and how much refrigeration runs behind your bars. Voltage optimisation typically cuts site electricity by up to 15%, KBR usually pays back in 12 to 18 months and the Cellar Manager alone cuts primary cellar cooling by around 30%. We work out your own figure from half hourly data before we quote.
03Will KBR affect beer or food temperatures?
No. KBR uses Thermocover probes that read like the product rather than the air, so the controller manages to the temperature that matters. Cellar and fridge temperatures are logged in Pulse, so you have records for EHOs, brand audits and your own quality checks.
04What is LineProof and how does it stop fobbing?
LineProof is KBR's new beer line management system. It combines antimicrobial drop lines, TF Module fob detectors and a yeast sediment trap. Together they stop bacteria building up in the lines, which is what causes fobbing and off flavours. In trade trials with Greene King, tested by the University of Nottingham, bacteria fell by 99.98% and zero fobbing was recorded.
05How often do beer lines need cleaning with LineProof?
Up to six weeks between cleans, compared with every 7 to 10 days on standard lines.
06Can you install without affecting events?
Yes. We plan every install around your event calendar and fit on dark days or before doors. KBR units and LineProof parts go in without shutting bars, and voltage optimisation needs only a short planned isolation that we schedule with your facilities team.
No charge, no obligation

Let’s take a look.

Tell us about your site, or send us your half hourly data. We come back within 24 hours with what we can see, and we talk it through. No charge, no obligation.